Starting today Monday 8 January there is a diversion on the approach to Oxford.
When drawing level with the Cherwell and the start of the boathouses on the far bank it is necessary to turn inland.
The turning is at first narrow before widening with a hard surface as the Eastwyke Farm Pathway by the Oxford Spires Hotel.
At Abingdon Road go right along the pavement for half a mile to reach Folly Bridge.
The temporary route is expected to be in place until at least the end of January.