Wallingford Bridge is closed following problems with a burst water main caused by the cold weather.
The bridge structure is being checked.
The Thames Path does not cross the bridge but the closure is affecting Thames Travel Buses.
See page 146.
Wallingford Bridge is closed following problems with a burst water main caused by the cold weather.
The bridge structure is being checked.
The Thames Path does not cross the bridge but the closure is affecting Thames Travel Buses.
See page 146.